# Battery storage returns in Germany

AvenX's October 2026 model estimates a 14.7% project return over 15 years for a typical 100 MW / 400 MWh battery in Germany starting in 2027; this is an illustration, not a forecast.[\*](https://www.avenx.nl/en#estimating-returns) The investment is paid back after about 6 years, helped by the exemption from grid fees for batteries connected before August 2029.[^23]

## Key figures

**Results of the AvenX battery model per country**

|  | Germany |
| --- | ---: |
| Earnings in 2027 (per MW) | €245,000 |
| Earnings over 15 years (per MW) | €2,786,856 |
| Grid fees over 15 years (per MW) | €0 |
| Years until the investment is paid back | 6 years |
| Project return (IRR) | 14.7% |

## Where do the earnings come from?

A battery earns from trading electricity on wholesale markets, from reserve markets that pay it to stand by and keep the grid stable (FCR and aFRR), and, where one exists, from a capacity market.[^6] The chart shows the model's earnings per MW of battery power, before costs.

## What drives the result?

Germany: batteries connected before 4 August 2029 pay no grid fees for 20 years,[^23] and a capacity market is expected from 2031.[^3] The main cost risk is a grid connection levy (BKZ) that network operators may now charge batteries.[^24]

## What if the assumptions are wrong?

Earnings are the most uncertain input. The table shows the project return if earnings or the investment differ by 20% from the base case.[^17][^16]

**Project return (IRR) per scenario and country**

| Scenario | Germany |
| --- | ---: |
| Base case | 14.7% |
| Earnings 20% lower | 9.4% |
| Earnings 20% higher | 19.6% |
| Investment 20% higher | 10.8% |
| Investment 20% lower | 20.1% |

## Other countries and the full method

- [Battery storage returns in the Netherlands](https://www.avenx.nl/en/battery-storage-returns-netherlands.md)
- [Battery storage returns in Poland](https://www.avenx.nl/en/battery-storage-returns-poland.md)
- [How we estimate battery returns](https://www.avenx.nl/en/methodology.md)

## Sources

[^23]: Herbert Smith Freehills Kramer. German grid fee reform for BESS: BNetzA preserves grandfathering, 12 Jun 2026. https://www.hsfkramer.com/notes/energy/2026-posts/german-grid-fee-reform-for-bess-bnetza-preserves-grand-fathering-protection-and-unveils-future-framework
[^6]: Enspired. Monthly BESS revenues and market trends, Q2 2026, 2026. https://www.enspired-trading.com/blog/monthly-bess-revenues-and-market-trends-q2-2026
[^3]: Modo Energy. German BESS investment outlook: Executive summary, 16 Mar 2026. https://modoenergy.com/research/en/germany-battery-investment-outlook-q2-2026-executive-summary
[^24]: dvlp.energy. Construction cost levy (BKZ) in 2026: overview of changes, 6 Feb 2026. https://www.dvlp.energy/en/blog/baukostenzuschusse-2026-veranderungen-im-uberblick
[^17]: BESS-Market. CAPEX Benchmark: What does a BESS project cost in 2026?, 25 Aug 2026. https://bess-market.com/en/knowledge/bess-capex-benchmark-2026/
[^16]: Modo Energy. 2026 Capex Survey, 9 Sept 2026. https://modoenergy.com/research/en/global-battery-capex-september-2026-research

---

AvenX is not yet offering investments. This page measures interest in a future product and is not an offer, solicitation or investment advice.

Investments may fall as well as rise, which may result in you getting back less than you put in. Past performance is not a guarantee of future results.

Last updated: 17 Oct 2026

More about AvenX: [How AvenX works](https://www.avenx.nl/en/how-it-works.md) · [How we estimate battery returns](https://www.avenx.nl/en/methodology.md) · [Risks of investing in battery storage earnings](https://www.avenx.nl/en/risks.md) · [Frequently asked questions](https://www.avenx.nl/en/faq.md) · [Glossary of battery storage terms](https://www.avenx.nl/en/glossary.md) · [Who runs AvenX](https://www.avenx.nl/en/about.md) · [Privacy notice](https://www.avenx.nl/en/privacy.md)

Source: https://www.avenx.nl/en/battery-storage-returns-germany